Renovation plumbing happens in two visits months apart, and almost everything that goes wrong in a bathroom traces back to the first one. Falls, waste positions, pipe routes and set-out all get locked in at rough-in, and they are expensive to change once the floor is down.
Three quick steps. Every enquiry answered within 12 hours. If it's urgent, call.
Could not send just now. Call Luke 0423 213 079 or Zach 0402 273 744, or email admin@bmadvanced.com.au
Renovation plumbing is done in two stages. Rough-in happens after demolition and before the walls and floor are closed up: the water pipes, waste pipes and drainage are installed in their final positions, the floor waste is set at the correct fall, and everything is pressure tested. Fit-off happens after tiling: tapware, mixers, shower fittings, toilets, vanities and sinks are installed and commissioned. Getting the rough-in right matters most, because the position of a floor waste or the route of a drain is fixed once the floor is tiled, and changing it later means lifting the work you just paid for.
We get called into other people's renovations often enough to know the pattern. Almost all of it is decided at rough-in.
If you are planning a renovation, get the plumber in at the design stage, not after the cabinetry is ordered. Ten minutes looking at the plan saves a great deal later.
We check the fixture positions against what is actually possible: where the existing drainage runs, how much fall is available, whether the wall can take the pipework, and whether the tapware you have chosen suits the setup. Changes here are free.
Old fixtures out, services capped and made safe. We work out what is behind the walls, which in older homes is often not what the previous owner told you.
Water and waste installed in their final positions. Floor waste set with correct fall. Pipework fixed and protected. Everything pressure tested before it is covered up, because finding a leak now is trivial and finding it later is a demolition job.
Not our trade, and we say so. We work around whoever is doing it and make sure they have what they need from us. Sequence matters here more than anywhere.
Once tiling is done, tapware, mixers, shower fittings, toilet, vanity and sink go in and get commissioned. Water on, everything tested, everything checked for leaks.
We run the water, check the fall by watching where it actually goes, and make sure the things you use every day are where you want them.
Renovation plumbing is priced on the job, and the biggest cost driver is whether you are keeping fixtures where they are or moving them.
We quote rough-in and fit-off as one job so you know the total plumbing cost before you start, rather than getting a second surprise months later at fit-off. If we hit something genuinely unforeseen behind a wall, we will show you and price it before we proceed.
The best money you can spend on a bathroom renovation is ten minutes of a plumber's time looking at your plan before anything is bought. It is also the step almost everyone skips.
At rough-in, the position of every pipe and every waste is fixed and then buried under screed, waterproofing and tiles. The fall of the floor towards the waste is set. The height of the shower mixer is set. Whether the vanity waste lines up with the vanity you have ordered is set. All of it becomes permanent the day the tiler starts.
Changing any of it afterwards means removing tiles and cutting into a waterproof membrane, which means re-waterproofing and re-tiling. That is why a decision worth nothing at planning stage can cost thousands three weeks later.
If you have ever stood in a shower with water pooling around your feet, or seen a puddle that sits in the middle of a bathroom floor for an hour, that is fall. The floor has to be shaped so water runs to the waste, and the waste has to be somewhere sensible. It is set at rough-in and screeding, it is invisible when the tiles are on, and it is the single most common thing people are unhappy about in a finished bathroom.
Pulling an original bathroom out of a Federation home in Wahroonga or Turramurra, or a 1960s bathroom in Baulkham Hills or Castle Hill, regularly reveals galvanised supply pipe, lead-jointed cast iron, or drainage that has been modified by three different tradespeople over sixty years. The right time to deal with all of that is while the wall is open, because it is a fraction of the cost then compared with later. We will show you what we found and give you a straight recommendation about what genuinely needs doing versus what can be left.
Demolition, then plumbing rough-in, then electrical rough-in, then wall and floor preparation, then waterproofing, then tiling, then plumbing fit-off and electrical fit-off. Trades out of order is the most common cause of a renovation running late and over budget, and it is almost always avoidable with a bit of planning.
Call Luke on 0423 213 079 or Zach on 0402 273 744, or send the form with your plan and we will come back to you within 12 hours.
Send us the layout, even a rough sketch, before the cabinetry and tapware are ordered. Every enquiry answered within 12 hours.